£3.00
Table of Contents
Rear cover
On the night of 23rd December 1893, a serious land slip occurred in Marple cutting. Single line working was introduced over the Down line between Strines and Marple South, a distance of just over 2 miles. This was on the Midland’s main route from Manchester to London. The “Disley cut-off” was not opened until 1902 and trains attached and detached portions at the cramped Marple station. Efforts were made quickly to minimise the inevitable delays being caused by the slip. This notice, which was issued on Christmas Day, shows that the section of single line operation was to be shortened by opening a new signalbox in Marple cutting and continuously manning the “special occasions only” box at the Goyt Viaduct. The new Marple Cutting box was opened around 29th December. Double line working was restored on 7th January 1894, but the repairs were nowhere near complete. It was June 1894 before the Engineer was able to slew the lines into their permanent positions and 22nd July before the temporary Marple Cutting box could be closed. Note the heading “Sheffield & Midland Joint Railway”. Was this the normal form used on operating notices at that time?